ArcGIS REST Services Directory Login | Get Token
JSON

Legend (DOT/DOT_PlanningLayers)

Average Daily Traffic (1)
Less than 4,500 Less than 4,500
4,500 - 9,500 4,500 - 9,500
9,501 - 15,500 9,501 - 15,500
15,501 - 22,500 15,501 - 22,500
22,501 - 34,500 22,501 - 34,500
Greater than 34,500 Greater than 34,500
Turning Movement Counts (5)
0 - 66 0 - 66
67 - 178 67 - 178
179 - 343 179 - 343
344 - 608 344 - 608
609 - 1307 609 - 1307
Vehicle Miles Traveled 2018 (2)
5.743386 - 9.841388 5.743386 - 9.841388
9.841389 - 12.334770 9.841389 - 12.334770
12.334771 - 15.191530 12.334771 - 15.191530
15.191531 - 19.654860 15.191531 - 19.654860
19.654861 - 30.172150 19.654861 - 30.172150
Vehicle Miles Traveled Latest (22)
5.743386 - 9.841388 5.743386 - 9.841388
9.841389 - 12.334770 9.841389 - 12.334770
12.334771 - 15.191530 12.334771 - 15.191530
15.191531 - 19.654860 15.191531 - 19.654860
19.654861 - 30.172150 19.654861 - 30.172150
VMT per Capita 2021 (Parcels) (16)
Below Threshold Below Threshold
City Average City Average
Mitigable Mitigable
Immitigable Immitigable
VMT per Capita 2021 (Simplified) (18)
Below Threshold Below Threshold
City Average City Average
Mitigable Mitigable
Immitigable Immitigable
VMT per Job 2021 (Parcels) (20)
Below Threshold Below Threshold
Below Average Below Average
Above Average Above Average
Immitigable Immitigable
VMT per Job 2021 (Simplified) (19)
Below Threshold Below Threshold
Below Average Below Average
Above Average Above Average
Immitigable Immitigable
VMT Industrial 2021 (Parcels) (21)
Threshold Threshold
Mitigable Mitigable
Immitigable Immitigable
VMT Industrial 2021 (Simplified) (17)
Threshold Threshold
Mitigable Mitigable
Immitigable Immitigable
General Plan Designated Roadway Typologies (4)
Expressway Expressway
Freeway Freeway
Grand Boulevard Grand Boulevard
Main Street Main Street
On-Street Primary Bicycle Facility On-Street Primary Bicycle Facility
Two Lane City Connector Street Two Lane City Connector Street
City Connector Street City Connector Street
Local Connector Street Local Connector Street
Master Planning Projects List Points (7)
Master Planning Projects List Segments (8)
Access and Mobility KPI Scores (15)
Proposed Bikeways (10)
Path or Trail Path or Trail
Protected Bike Lane Protected Bike Lane
Bike Lane or Protected Bike Lane Bike Lane or Protected Bike Lane
Bike Lane Bike Lane
Bike Boulevard Bike Boulevard
Spot Improvement Spot Improvement
Existing Bikeways (11)
Path or Trail Path or Trail
Protected Bike Lane Protected Bike Lane
Bike Lane (with buffer) Bike Lane (with buffer)
Bike Lane Bike Lane
Bike Boulevard Bike Boulevard
Bike Route Bike Route
Priority Network (12)
Path or Trail Path or Trail
Protected Bike Lane Protected Bike Lane
Bike Lane or Protected Bike Lane Bike Lane or Protected Bike Lane
Bike Lane Bike Lane
Bike Boulevard Bike Boulevard
Spot Improvement Spot Improvement
Focus Areas (13)
VTARidershipWeekday (57)
VTARidershipSaturday (56)
VTALightRailStops (55)
VTABusStops (53)
SignalsWithPlannedBusTSP (47)
SignalsWithExistingLightRailTSP (46)
SignalsWithExistingBusTSP (45)
PlannedTransportationProjectsPoint (39)
LEHDPointsClip (35)
Gaps (30)
CrashesClip (28)
BARTLightRailStops (25)
VTALightRailRoutes (54)
VTABusRoutes (52)
SidewalksEcopia (44)
SidewalkGaps50Ft (43)
RoadwayVolumesWeekdaySpring2023 (42)
PlannedTransportationProjectsLine (38)
GapsLine (32)
Crosswalks (29)
TransportationDevelopmentProjectsClip (51)
Transit10MinWalksheds (50)
SurfaceParking (49)
SOV2040Goal (48)
RaisedPaintedMedians (41)
PopulationAndEmploymentChange (40)
ParcelsSelection (37)
NorthSanJoseMask (36)
HeatIndex (34)
GroundwaterSLR (33)
GapsBuffers300 (31)
CensusTractPopulationACS2022Clip (27)
CensusTractPopulationACS2022 (26)
AccessAndMobilityKPIScores (24)